ZOHR Project – Supplying ALD Survey

 In Project

ALD survey, ZOHR Project

Among the Zohr Project, during the summer 2018 Colmar Italia has been commissioned to participate into a phase of the ZOHR Development project. Colmar was called out by SAIPEM Spa to inspect umbilical and structures to identify the cause of a pressure loss on two lines inside the umbilical.

The Acoustic Leak Detector system was installed on the Saipem workclass ROV Innovator and the leaks were successfully  located at the first attempt. Depth was 1500m.